Image Page Menu

 


 

 

Assembly (Gas Tank & Foot Boxes)
Click on the image to view a more detailed picture.


Reproduction
AC Pedals from
Finish Line

Mustang Pedal Box

Bolt in front of brake pedal arm prevents the rod from pulling out of the Master cylinder


Bend the brake tubing and distribution block bracket to mount the block to the frame


The back side of the pedals is milled to allow the arm to slip in.


Distribution block


Notch removed from gas tank provides extra clearance for quick jack bolts



Fuel filter
This is why you should drill the rivet holes BEFORE the silicon is applied


You drill lots of holes!


Adjusting the pedals (again)


New BFG Radial TA's on refinished Mustang Turbine wheels

FFR Bumpsteer kit. I cut 1" off each tie rod & enlarged the hole in the spindle to make it fit.


It Rolls! 2/27/2000

 


Throttle cable (closed)
I need to check the angle on this. It looks like it will wear fast.


Throttle cable (open)


Drivers footbox & transmission tunnel


Footbox and pedals


Transmission tunnel & foot box seams


Master cylinder & front of drivers foot box


Front brake line bracket


Passinger footbox and trans. tunnel

 


Footboxes with trans. tunnel cover in place

Pedal box from top


Modified Throttle cable end


Steering shaft cover with the bellows from the Mustang shaft used for weather proofing


Flaming River rag joint replacement shaft and
U-joints

     
Cobra Dog..
So far he's eaten manuals, screws, nuts, bolts, steelwool &, paint brushes


Go to Menu